Madonna,
We have a 2552 on order so I can report on the delivery in about 6-7 weeks if all goes well! This forum has been very helpful in deciding what options/additions to include. As John mentioned, all the specifics are on the build sheet that Earl sent and I signed. We plan on spending the first night at the factory to turn every switch on and off, run every system including the gray & black water tanks while still pristine, open every drawer and door, climb on the roof and crawl underneath. I plan on taking a tool kit to include flashlight, inspection mirror, tire pressure gauge, multi-meter, thermometer, and of course a bottle of champaigne!
Steve