We dropped our coach off at the factory last Thursday and picked it up today. Spent the weekend with our son and granddaughter.
The factory had a list of things I wanted looked at and had everything finished up when we picked up today. A big thanks to Doug and Dan for their work on getting everything completed on time.
They:
- changed out the slide seals to the new model
- adjusted the entry door to fix a misalignment and put on new seals
- replaced some broken screws under the front of the slide
- changed the plumbing on the macerator to a hard pipe to the utility compartment
- added a grommet for the macerator hose at the entrance to the utility compartment
- replaced the 4 way valve with the new 3 way brass one
- added mechanical safety latches to the drawers in our pantry
- added a second grab bar on the right side of the door
- checked the roof seams
- replaced a blown fuse on the truck charging circuit
With many stories on the internet about people waiting months to have work done (poorly) on a coach it is a real pleasure to be dealing with a company that just takes care of their customers with no fuss. They were happy to fix my issues and also updated some things that have been improved to current standards without my even asking.
Thanks Phoenix!!